Integrated Disaster Risk Management and Resilience Program

Resumo*

The objective of the Integrated Disaster Risk Management and Resilience Program-for-Results Project for Morocco is to improve the institutional framework to finance disaster risk reduction activities and strengthen financial resilience to natural disasters for targeted populations in the Program area. Morocco has begun developing an integrated DRM reform program, which combines elements of institutional reform with risk reduction investments and risk...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

The program development objective (PDO) is to improve the institutional framework to finance disaster risk reduction activities and strengthen financial resilience to natural disasters for targeted populations in the Program Area.

Chave Detalhes

Projeto Detalhes

  • P144539

  • Active

  • Atishay Abbhi , Philipp Petermann, Reda Aboutajdine

  • Ministry of Economy and Finance,Ministry of Economy and Finance

  • Marrocos

  • 4 de dezembro de 2015

  • (conforme apresentação da Diretoria Executiva)

    20 de abril de 2016

  • 16 de novembro de 2016

  • US$ 200.00 milhões

  • N/A

  • 1 de fevereiro de 2024

  • 31 de março de 2025

  • TBD

  • BANK APPROVED

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
International Bank for Reconstruction and Development 200.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD 200.00
Compromissos da AID N/A
Compromisso do BIRD + AID 200.00
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 200.00

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 28 de fevereiro de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 28 de fevereiro de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Progress towards achievement of PDO Satisfactory 2025-03-28
Monitoring and Evaluation Satisfactory 2025-03-28
Overall Implementation Progress (IP) Satisfactory 2025-03-28

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • The FLCN strategic orientation and governance structure are redesigned with a focus on disaster risk reductionValorThe FLCN focuses mainly on post disaster event risThe Steering committee, the National Selection ComAn action plan for disaster risk awareness raising
    Data20 de abril de 201617 de novembro de 202329 de dezembro de 2023
    Comentário
  • Cumulative number of direct beneficiaries of completed structural risk reduction subprojects (% women)Valor0.00230632.00250000.00
    Data20 de abril de 201617 de novembro de 202331 de março de 2025
    Comentário
  • Cumulative number of direct and indirect beneficiaries of completed non-structural risk reduction subprojects (% women)Valor0.0033216793.0033000000.00
    Data20 de abril de 201617 de novembro de 202331 de março de 2025
    Comentário
  • Minimum number of people in the Program Area insured for bodily injury against catastrophic eventsValor0.008957954.005850000.00
    Data20 de abril de 201617 de novembro de 202331 de dezembro de 2020
    Comentário
  • Establishment and operationalization of the FSEC to protect the uninsuredValor-FSEC received initial financial contributions as pFSEC received initial financial contributions as p
    Data20 de abril de 201617 de novembro de 202331 de dezembro de 2019
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Minimum percentage of entities responsible for the implementation of eligible subprojects having received technical assistance and/or trainingValor0.0070.0070.00
    Data20 de abril de 201617 de novembro de 202329 de dezembro de 2023
    Comentário
  • Cumulative amount of FLCN funds allocated to eligible subprojectsValor0.001101178509.001400000000.00
    Data20 de abril de 201617 de novembro de 202331 de março de 2025
    Comentário
  • Adoption of the catastrophic risk insurance legislative and regulatory frameworkValor-The implementation legal documents referred to in The implementation legal documents referred to in
    Data20 de abril de 201617 de novembro de 202331 de dezembro de 2018
    Comentário
  • Improved risk assessment models developed and operationalValorNoProbabilistic catastrophe risk models for i) evaluProbabilistic catastrophe risk models for i) evalu
    Data20 de abril de 201617 de novembro de 202331 de dezembro de 2019
    Comentário
  • Minimum percentage of FLCN funds allocated to eligible non-structural subprojectsValor0.0017.0410.00
    Data20 de abril de 201617 de novembro de 202329 de dezembro de 2023
    Comentário
  • Cumulative number of structural subprojects benefitting from at least one site visitValor0.0030.00100.00
    Data30 de março de 202117 de novembro de 202331 de março de 2025
    Comentário
  • Minimum percentage of total funding of eligible subprojects provided by the entities responsible for implementation and partnersValor0.0058.0045.00
    Data20 de abril de 201617 de novembro de 202329 de dezembro de 2023
    Comentário
  • Cumulative value of total funding of completed eligible subprojects achieving disaster risk reduction targetsValor0.00369517753.541000000000.00
    Data20 de abril de 201617 de novembro de 202331 de março de 2025
    Comentário