Cameroon Nachtigal Hydropower Project

Resumo*

The objective of the Nachtigal Hydro Power Project for Cameroon is to increase the availability of renewable energy power and leverage private finance for the project. The Project Company (under Local Loan Guarantee) will covenant, among other things, that it will: (i) use the proceeds of the disbursements under the IBRD-Guaranteed Loan Facility exclusively for the Project and in accordance with the terms and conditions of the IBRD-Guaranteed Loan...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

The Project development objective is to increase the availability of renewable e nergy power and leverage private finance for the Nachtigal Hydropower Project.

Chave Detalhes

Projeto Detalhes

  • P157734

  • Active

  • Ahmed Ousman Abani , Patrice Caporossi, Olayinka Edebiri

  • Government of Cameroon

  • Camarões

  • 23 de abril de 2018

  • (conforme apresentação da Diretoria Executiva)

    19 de julho de 2018

  • N/A

  • US$ 1120.00 milhões

  • Nachtigal Hydro Power Company

  • Western and Central Africa

  • 2019

  • US$ 430.00 milhões

  • N/A

  • 19 de dezembro de 2024

  • 30 de junho de 2025

  • BANK APPROVED

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
IBRD Guarantee 300.00
Bilateral Agencies (unidentified) 150.00
Borrower/Recipient 70.00
Foreign Multilateral Institutions (unidentified) 280.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD N/A
Compromissos da AID N/A
Compromisso do BIRD + AID N/A
Instrumento de empréstimo
Montante do subsídio 430.00
Custo total do projeto** 1120.00

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 31 de março de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 31 de março de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Procurement Satisfactory 2024-03-01
Project Management Satisfactory 2024-03-01
Progress towards achievement of PDO Satisfactory 2024-03-01
Financial Management Satisfactory 2024-03-01
Monitoring and Evaluation Satisfactory 2024-03-01
Overall Implementation Progress (IP) Moderately Satisfactory 2024-03-01

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Generation capacity of energy constructed or rehabilitatedValor0.000.00420.00
    Data24 de dezembro de 201814 de fevereiro de 202429 de novembro de 2024
    Comentário
  • Additional operating net capacity available (MW)Valor0.000.00400.00
    Data24 de dezembro de 201814 de fevereiro de 202429 de novembro de 2024
    Comentário
  • Private cumulative Capital Mobilized for the Nachtigal Hydropower Project (EUR million), of which from cumulative local sources (EUR million equivalent)Valor0 (0)321 (144)351.6 (161.6)
    Data24 de dezembro de 201814 de fevereiro de 202420 de agosto de 2023
    Comentário
  • Avoided global GHG emissions (teqCO2)Valor0.000.00836000.00
    Data24 de dezembro de 201814 de fevereiro de 202429 de novembro de 2024
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Construction of the civil works (% of progress)Valor093.6%100%
    Data24 de dezembro de 201829 de dezembro de 202330 de setembro de 2024
    Comentário
  • Supply, erection and commissioning of equipment (% of progress)Valor0%87.8%100%
    Data24 de dezembro de 201829 de dezembro de 202330 de setembro de 2024
    Comentário
  • Construction of the transmission line (% progress)Valor0%100%100%
    Data24 de dezembro de 201829 de dezembro de 202320 de agosto de 2023
    Comentário
  • Implementation of the ESMP (% progress or milestones)Valor0%95%100%
    Data24 de dezembro de 201829 de dezembro de 202330 de setembro de 2024
    Comentário
  • Trial run results of the Nachtigal hydropower Project meet owner's performance targets (yes/no)ValorNoNoYes
    Data24 de dezembro de 201829 de dezembro de 202330 de setembro de 2024
    Comentário
  • Project related grievances registered under the Project grievance redress mechanism and addressed (percentage)Valor0%86%100%
    Data24 de dezembro de 201829 de dezembro de 202330 de setembro de 2024
    Comentário