Skip to Main Navigation

Matanza-Riachuelo Basin (MRB) Sustainable Development Project Additional Financing

Objetivo de Desenvolvimento

The overall development objective of the proposed APL program supports the Government's Integrated Basin Cleanup whilesimultaneously improving sanitary conditions along the banks of La Plata River and providing a long-term and cost-effectivesolution for safe disposal of wastewater from the Buenos Aires Metropolitan Area (AySAs concession area). The two stage APL programthat contributes to this objective and the allocation of works and activities under each APL has been specifically designed toensure that APL-1 can be free-standing, with no stranded assets at the end of the first stage. The project (APL-1) development objectives contribute to the overall program development objective by (i) improving sewerageservices in the M-R River Basin and other parts of the Province and City of Buenos Aires by expanding transport and treatmentcapacity; (ii) supporting a reduction of industrial discharges to the M-R River, through the provision of industrial conversiongrants to small and medium enterprises; (iii) promoting improved decision-making for environmentally-sustainable land use anddrainage planning, and piloting urban drainage and land use investments, in the M-R River Basin; and (iv) strengthening ACUMAR#sinstitutional framework for ongoing and sustainable clean-up of the M-R River Basin.

Chave Detalhes

Projeto Detalhes

  • P171197

  • Active

  • Jiang Ru , Maria Ramirez, Elba Lydia Gaggero

  • Argentine Republic

  • Argentina

  • 17 de julho de 2019

  • (conforme apresentação da Diretoria Executiva)

    5 de setembro de 2019

  • N/A

  • US$ 332.00 milhões

  • Ministry of Interior, Public Works and Housing,Unidad Coordinadora General del Proyecto (UCGP)

  • América Latina e Caribe

  • 2020

  • US$ 245.00 milhões

  • A

  • Não aplicável

  • 30 de setembro de 2025

  • Yes

  • BANK APPROVED

  • P105680

  • 15 de novembro de 2023

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
International Bank for Reconstruction and Development 245.00
Borrower/Recipient 87.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD 245.00
Compromissos da AID N/A
Compromisso do BIRD + AID 245.00
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 332.00

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Não há dados disponíveis

CLASSIFICAÇÕES DAS CONCLUSÕES

INDICADORRELATÓRIO SOBRE A CONCLUSÃO E RESULTADOS DA IMPLEMENTAÇÃO:
Resultados
Risco para o resultado de desenvolvimentoSubstantial
Desempenho do Banco Mundial
Desempenho do mutuário
Desempenho do governo
Entidade Executora

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

Não há dados disponíveis