Paraguay has been characterized by relatively solid economic growth and poverty reduction in recent years, but the COVID-19 pandemic threatens to stall or even reverse this progress. Almost two-thirds of Paraguayans live in cities, and 38% of the total population is concentrated in the Metropolitan Area of Asunción (AMA), whose rapid growth has not been accompanied by a corresponding capacity to plan and provide services to an increasingly complex...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

The project development objectives are to improve living conditions for targeted vulnerable households and to increase resilience in selected areas in the riverfront of Asunción.

Chave Detalhes

Projeto Detalhes

  • P175320

  • Active

  • Alvaro Barra , Santiago Scialabba, Nicolaas de Groot

  • Republic of Paraguay

  • Paraguai

  • 23 de dezembro de 2020

  • (conforme apresentação da Diretoria Executiva)

    15 de novembro de 2022

  • 23 de fevereiro de 2024

  • US$ 105.00 milhões

  • Ministry of Public Works and Communications (MOPC)

  • América Latina e Caribe

  • 2023

  • US$ 105.00 milhões

  • N/A

  • Substantial

  • 29 de dezembro de 2028

  • Yes

  • BANK APPROVED

  • 4 de março de 2024

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
International Bank for Reconstruction and Development 105.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD 105.00
Compromissos da AID N/A
Compromisso do BIRD + AID 105.00
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 105.00

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Progress towards achievement of PDO Moderately Satisfactory 2025-03-12
Project Management Moderately Satisfactory 2025-03-12
Monitoring and Evaluation Moderately Satisfactory 2025-03-12
Procurement Satisfactory 2025-03-12
Financial Management Satisfactory 2025-03-12
Overall Implementation Progress (IP) Moderately Satisfactory 2025-03-12

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • People provided with improved urban living conditionsValor0.000.002400.00
    Data1 de novembro de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Number of vulnerable households with reduced risk of flooding in the riverfront of Asunción considering climate change impactsValor0.000.00700.00
    Data1 de novembro de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Number of people with new jobs after receiving training, technical assistance, or grantsValor0.000.001000.00
    Data1 de fevereiro de 20229 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • People provided with improved urban living conditions - Female (RMS requirement)Valor0.000.000.00
    Data
    Comentário
  • Percentage of whom are femaleValor0.000.000.00
    Data
    Comentário
  • Increased use of upgraded and rehabilitated public spaces and green spaces with climate resilient designValor0.000.0050.00
    Data1 de fevereiro de 20229 de fevereiro de 202331 de dezembro de 2027
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Municipal and national government officials trained by capacity building activitiesValor0.000.00100.00
    Data20 de abril de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Share of resettled population who report their living situation has improvedValor0.000.0075.00
    Data20 de abril de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Center for Local Economic Development and Social Innovation constructedValorNoNoYes
    Data20 de abril de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Women trained in skills for labor-intensive non-traditional sectorsValor0.000.00250.00
    Data20 de abril de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Streets upgraded with low-carbon climate resilient design and improved green and gray infrastructureValor0.000.004000.00
    Data20 de abril de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Percentage of whom are femaleValor0.000.000.00
    Data
    Comentário
  • Share of female resettled population who report their living situation has improvedValor0.000.000.00
    Data
    Comentário
  • Guidelines, studies, and technical notes to promote low-carbon climate resilient urban planningValor0.000.005.00
    Data20 de abril de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Recovery of Las Mercedes and Peru urban streams within the project intervention areaValorNoNoYes
    Data20 de abril de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Share of beneficiaries who consider that design of investments subject to consultation is responsive to their needs/viewsValor0.000.0075.00
    Data20 de abril de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Walking and cycling paths to improve the accessibility of Banco San MiguelValor0.000.009800.00
    Data20 de abril de 20219 de fevereiro de 202331 de dezembro de 2027
    Comentário
  • Share of female beneficiaries who consider that design of investments subject to consultation is responsive to their needs/viewsValor0.000.000.00