SIRAP2 was approved by the Board on June 1, 2022, with US$89.21 million financing. The project aims to improve the climate resilience and safety of the Recipient’s road and aviation sectors through four components: (i) Climate Resilience and Safety Investments in the Aviation Sector, (ii) Climate Resilience and Safety Investments in the Road Sector, (iii) Institutional Strengthening and Project Management, and (iv) Contingent Emergency Response. The...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

To improve the climate resilience and safety of the Recipient's road and aviation sectors, and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it.

Chave Detalhes

Projeto Detalhes

  • P176548

  • Active

  • Naoki Kakuta , Keelye Hanmer

  • Solomon Islands

  • Ilhas Salomão

  • 30 de junho de 2021

  • (conforme apresentação da Diretoria Executiva)

    1 de junho de 2022

  • 23 de junho de 2022

  • US$ 89.21 milhões

  • Ministry of Infrastructure Development,Ministry of Communication and Aviation

  • Leste Asiático e Pacífico

  • 2022

  • US$ 89.21 milhões

  • N/A

  • Moderate

  • 30 de junho de 2029

  • Yes

  • BANK APPROVED

  • 27 de junho de 2024

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
IDA Credit 67.69
IDA Grant 21.52

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD N/A
Compromissos da AID 89.21
Compromisso do BIRD + AID 89.21
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 89.21

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Progress towards achievement of PDO Satisfactory 2025-04-14
Financial Management Satisfactory 2025-04-14
Monitoring and Evaluation Satisfactory 2025-04-14
Project Management Satisfactory 2025-04-14
Overall Implementation Progress (IP) Satisfactory 2025-04-14
Procurement Satisfactory 2025-04-14

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Bridges with climate resilience and safety measures constructed and in useValor0.000.004.00
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Roads with climate resilience and safety measures constructed and in useValor0.000.009.90
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Airport or airfield runway with climate resilience and safety measures constructed and in useValor0.000.002.00
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Modernization of air traffic and aviation safety managementValorNo ADS-B or VSATNo ADS-B or VSATADS-B and VSAT fully operational
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Enhanced climate resilience and operational safety at regional airports under preventative and corrective airport maintenance program for airport equipment and facilitiesValorNoNoYes
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Honiara Airport rescue fire service vehicle station constructed and code of conduct establishedValorNoNoYes
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Consultancy for detailed design and supervision of building and civil works providedValorNo contract with the consulting firm in placeThe Design Reports for most of all the key infrastSupervision of building and civil works completed
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Honiara Airport Automated Weather Observation System (AWOS) installed and operationalValorNoNoYes
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • National Airports Development Plan preparedValorNoNoYes
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Honiara and Munda Airports air traffic control (ATC) towers constructed and operationalValor0.000.002.00
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Successful implementation of agreed training plan for MCA and Solomon AirlinesValorNo trainingTraining plan preparedTraining plan completed
    Data31 de janeiro de 202215 de fevereiro de 202430 de junho de 2029
    Comentário
  • People with enhanced access to transportation servicesValor0.000.00120000.00
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Regional Airport Asset Maintenance Contract in placeValorNoNoYes
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Women employed in technical or management positions within MCAValor20.0033.0040.00
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • People with enhanced access to transportation services - Roads/HighwaysValor0.000.00120000.00
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Road safety audits completedValor0.001.002.00
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Roads rehabilitated, which are equipped with gender responsive road safety infrastructureValor0.000.00100.00
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Road network criticality and vulnerability assessments and sustainable road financing strategy completed and in useValorRoad network criticality and vulnerability assessmRoad network criticality and vulnerability assessmRoad network criticality and vulnerability assessm
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Grievance registered related to delivery of project benefits that are addressedValor0.000.0075.00
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário
  • Road upgraded using participatory design approachesValor0.000.009.90
    Data31 de janeiro de 202231 de dezembro de 202330 de junho de 2029
    Comentário