The project is the second one in a program of World Bank lending to reduce plastic waste leakage in China, with an expansion of engagement to the under-served rural areas compared with the urban focus of phase one. The project will inform plastic waste management at the national level, strengthen subnational MSW institution towards better integrated rural-urban MSW management and service provision, through policy, technical, and knowledge assistance...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

To reduce plastic pollution from municipal solid waste in selected under-served rural areas of Shaanxi Province, improve provincial plastic waste management, and draw lessons on plastic waste management relevant at the national level.

Chave Detalhes

Projeto Detalhes

  • P176989

  • Active

  • Jian Xie , Guangming Yan

  • People's Republic of China

  • China

  • 26 de maio de 2022

  • (conforme apresentação da Diretoria Executiva)

    23 de março de 2023

  • 19 de fevereiro de 2024

  • US$ 393.75 milhões

  • Provincial Development and Reform Commission

  • Leste Asiático e Pacífico

  • 2023

  • US$ 250.00 milhões

  • N/A

  • High

  • 31 de dezembro de 2029

  • Yes

  • BANK APPROVED

  • 19 de fevereiro de 2024

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
International Bank for Reconstruction and Development 250.00
Borrower/Recipient 90.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD 250.00
Compromissos da AID N/A
Compromisso do BIRD + AID 250.00
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 393.75

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Progress towards achievement of PDO Satisfactory 2024-12-03
Procurement Satisfactory 2024-12-03
Financial Management Satisfactory 2024-12-03
Project Management Satisfactory 2024-12-03
Monitoring and Evaluation Satisfactory 2024-12-03
Overall Implementation Progress (IP) Moderately Satisfactory 2024-12-03

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • D. Strengthened provincial regulations and institutional measures for plastic waste managementValor0.000.005.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • A. Reduced leakage of plastics to the environment from improved waste management operationsValor0.000.0038400.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • E. Urban-rural integrated model for municipal solid waste service developed by Shaanxi and disseminated to national agenciesValorNoNoYes
    Data28 de março de 202230 de novembro de 202331 de dezembro de 2029
    Comentário
  • B. Safe disposal ratio of municipal solid wasteValor15.0015.0076.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • C. GHG emissions reduction from improved waste management systems including resource recycling/recovery (Metric tons CO2e/year)Valor0.000.00330000.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • 1. Shaanxi provincial inter-departmental coordination mechanism governing urban-rural SWM integration established and operationalValorNoNoYes
    Data23 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 7. Coverage of integrated MSW service in rural areasValor10.0010.0072.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 12. Residents satisfaction rate of MSWM service of which women (Percentage)Valor28.0028.0083.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 2. Shaanxi province technical standards and guidelines for urban-rural waste management as well as local policy and technical guidance for rural waste separation developed and adoptedValorNoNoYes
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 8. Number of landfills (open dumpsites) closedValor0.000.006.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 13. Share of new jobs created in the SWM sector in project counties/districts of which womenValor0.000.0045.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 3. Integrated urban-rural SWM information platforms established and operational in project counties/districtsValorNoNoYes
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 9. Rehabilitated, expanded or newly constructed transfer stations and sorting linesValor0.000.0070.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 4. KPIs and the related monitoring processes related to rural waste collection and transportation developed and adoptedValorNoNoYes
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 10. Increased farmland using agricultural plastic film with thickness of 0.01mm or aboveValor0.000.0068.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 5. Action plan adopted for effective transition to standard plastic film (thicker than 0.01mm)ValorNoNoYes
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 11. Increase in agricultural plastic film waste collected and safely disposed based on the Performance-based Incentive Financing mechanismValor0.000.0075.00
    Data31 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário
  • 6. Consultations and knowledge exchange events between Shaanxi and central agencies on urban-rural integration in MSWMValor0.000.006.00
    Data28 de março de 202330 de novembro de 202331 de dezembro de 2029
    Comentário