Technical Assistance for Kambarata 1 Hydropower Plant Project

Resumo*

The project will help advance the preparation of the Kambarata 1 hydropower plant so that it is ready to be financed by interested financiers and donors. The project will support activities in these areas as described below. Component 1 is expected to update the technical and economic feasibility which will identify the gaps in the previous studies, carry out additional activities as needed, possibly including physical modelling, surveys, site investigation...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

To assess the Kambarata 1 hydropower plant project’s technical feasibility, enhance its environmental and social sustainability, and strengthen its financial and commercial frameworks.

Chave Detalhes

Projeto Detalhes

  • P181086

  • Active

  • Maksudjon Safarov , Hazuki Terada

  • Kyrgyz Republic

  • Quirguistão

  • 19 de maio de 2023

  • (conforme apresentação da Diretoria Executiva)

    31 de outubro de 2023

  • 11 de março de 2024

  • US$ 5.00 milhões

  • Ministry of Energy

  • Europa e Ásia Central

  • 2024

  • US$ 18.60 milhões

  • N/A

  • High

  • 31 de dezembro de 2027

  • Yes

  • BANK APPROVED

  • 15 de maio de 2024

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
Energy Sector Management Assistance Program 2.00
Regional Program on Central Asia - Energy & Water Developmen 2.60
IDA Credit 14.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD N/A
Compromissos da AID 14.00
Compromisso do BIRD + AID 14.00
Instrumento de empréstimo
Montante do subsídio 4.60
Custo total do projeto** 5.00

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Procurement Satisfactory 2025-03-11
Financial Management Moderately Satisfactory 2025-03-11
Progress towards achievement of PDO Satisfactory 2025-03-11
Monitoring and Evaluation Satisfactory 2025-03-11
Overall Implementation Progress (IP) Satisfactory 2025-03-11
Project Management Satisfactory 2025-03-11

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • The environmental and social instruments of the Kambarata 1 HPP comply with the World Bank’s requirements and international standardsValorNoNoYes
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • The Government adopts a macroeconomically sustainable and financially viable plan for Kambarata 1 HPP projectValorNoNoYes
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • An updated technical feasibility study is completed with quality acceptable to the panels of experts and the World BankValorNoNoYes
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • International consultant for feasibility updating is procuredValorNoNoYes
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • International consultant is procured to update/prepare safeguards instrumentsValorNoNoYes
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • Consultants are employed to carry our additional financial assessments and studies and advise on a creditable financing planValorNoNoYes
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • Increase in the number of women taking on permanent jobs at EPP at technical and managerial levelsValor10.000.0015.00
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • A panel of experts for dam safety is employedValorNoNoYes
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • A panel of environmental and social experts is established to provide independent advice and guidanceValorNoNoYes
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • Workshops and training are conducted to share knowledge/experience on large hydropower financing and contractual arrangementsValor0.000.005.00
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • Complaints received which are responded and resolved within the specified timeframeValor70.000.0090.00
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • Potential generation capacity of hydropower to be added based on results of the projectValor0.000.001860.00
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • Number of EPP, MoE and other stakeholder staff trainedValor0.000.0090.00
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027
    Comentário
  • A benefit sharing mechanism for Kambarata 1 is developedValorNoNoYes
    Data10 de maio de 202331 de janeiro de 202431 de dezembro de 2027