Skip to Main Navigation

Overview

NOTICE AT-A-GLANCE

  • P181341

  • Accelerating Sustainable and Clean Energy Access Transformation in SOMALIA

  • Somalia

  • OP00336262

  • Invitation for Bids

  • Published

  • SO-MOEWR-464597-CW-RFB

  • Request for Bids

  • English

  • Apr 14, 2025 10:30

  • Jan 30, 2025

CONTACT INFORMATION

  • Ministry of Energy and Water Resource

  • Liban Ali Ibrahim

  • PIU Office, MoEWR, FGS, Airport Road, next to Ali Jim’ale Mosq, Waberi District, Mogadishu, Somalia

  • Somalia

  • Somalia

  • +252 770 980 456

Details

Request for Bids

Plant
Design, Supply Installation, Testing and Commissioning

(Two-envelope Bidding Process, Without Prequalification)

Employer:

Ministry of Energy and Water Resources,

Project:     

Somalia Accelerating Sustainable and Clean Energy Access Transformation (ASCENT)

Contract title:

Design, Supply, Installation, Testing, and Commissioning of 55MWp (AC) Solar PV Power Plant with 160MWh of Battery Energy Storage System for Beco at Jazeera Power Plant, Mogadishu, Somalia.

Country:

Federal Government of Somalia

Grant No.:

IDA-E268-SO

RFB No:  

SO-MOEWR-464597-CW-RFB

Issued on:  

30 January 2025

 

1. The Federal Government of Somalia has received financing from the World Bank towards the cost of the Somalia Accelerating Sustainable and Clean Energy Access Transformation Project and intends to apply part of the proceeds toward payments under the Contracts for Design, Supply, Installation, Testing, and Commissioning of 55MWp (AC) Solar PV Power Plant with 160MWh of Battery Energy Storage System for Beco at Jazeera Power Plant, Mogadishu, Somalia. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing except for those payments which the contract provides to be made through letter of credit.

2.   The Ministry of Energy and Water Resources now invites sealed Bids from eligible Bidders for provision of Design, Supply, Installation, Testing and Commissioning of 55MWp (AC) Solar PV Power Plant with 160MWh of Battery Energy Storage System for Beco at Jazeera Power Plant, Mogadishu, Somalia as detailed in the table below.

Table1: Description of the Power Plant

Item

Description

Details

A

Project General Information

 

1

Name of the plant

Proposed Hybrid PV Power Plant for Beco, at Jazeera Power Plant, Mogadishu, Somalia.

2

GPS Coordinates

  • 15536.98°, 45423.50°
  • 15553.21°, 45515.70°
  • 1565.20°, 453571.84°
  • 15727.64°, 45356.28°
  • 15737.50°, 45410.81°

3

Location

Mogadishu, Somalia

4

Project Scope

Design, Supply, Installation, Testing, and Commissioning of 55MWp (AC) Solar PV Power Plant with 160MWh of Battery Energy Storage

5

Available land

at Jazeera Power Plant

6

GPS coordinates of the available land

  • 15536.98°, 45423.50°
  • 15553.21°, 45515.70°
  • 1565.20°, 453571.84°
  • 15727.64°, 45356.28°
  • 15737.50°, 45410.81°

C

Required Plant Capacity - New Equipment

 

1

Solar PV Capacity

Minimum 55MWp (AC)

2

Battery Energy Storage System Capacity

Minimum 160MWh consumable energy

5

PV Performance Ratio

Minimum 90%

F

System Optimisation and Monitoring

 

1.

Grid controller

Required, with frequency loop control mode

2.

Optimisation configuration

PV - Given first priority

BESS - Given second priority

Genset - Given third priority

3.

Data collection

Daily, weekly, monthly, quarterly and annually

4.

Data storage

Local storage server and cloud

5

SCADA access

Remote, Auto, Local. Shall be accessible through web

6

Point of Interconnection

33kV

G

Power Evacuation

 

1

Evacuation from the Generation Substation

6,800 kVA Transformer feeder bays to be connected to the common bus of GIS 33kV with bus coupler for evacuation through a

2x double circuit (double circuit OHL+ double circuit of underground).  See attached SLD for further clarity. The scope for both OHL + UGL evacuation lines shall be of a separate scope.

The project’s delivery period is Fifteen (15) to Eighteen (18) months from the effective date.

3.        Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” dated September 2023 (“Procurement Regulations”) and is open to all eligible Bidders as defined in the Procurement Regulations.

4.        Interested eligible Bidders may obtain further information from the Interim Project Coordinator, Project Implementation Unit, Ministry of Energy and Water Resources, email address: sesrp.procurement@gmail.com and inspect the bidding document during office hours from 8.30am to 4.00pm at the address given below.

5.        The bidding document in English may be obtained free of charge by interested eligible Bidders on the https://sesrp.moewr.gov.so/company-overview/careers/ website or can be provided upon submission of a written application to the address below.

6.        A Pre-bid conference shall be conducted virtually by the Employer, the Ministry of Energy and Water Resources, Mogadishu, Somalia on 13 March 2025 at 10.30 am Mogadishu Local Time through the following link: 

https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzkxYzRkNzQtMzM2Zi00ZjU4LWI4NzItOThhMzM0MWViYzhk%40thread.v2/0?context=%7b%22Tid%22%3a%224b471a60-88ee-4c96-87e7-c9beee1ca249%22%2c%22Oid%22%3a%22d72bc85d-7b1f-4248-8f42-6f8a6ff74abb%22%7d

No site visits shall be organized by the employer, but bidders are encouraged to contact BECO-Mogadishu headquarters for site visits to familiarize themselves fully with the scope of work envisaged.

7.        Bids must be delivered to the address below on or before 10.30 am on 14 April 2025. Electronic bidding will not be permitted. Late Bids will be rejected. The outer Bid envelopes marked “ORIGINAL BID”, and the inner envelopes marked “TECHNICAL PART” will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend, at the address below, at 11.00 am on 14 April 2025. All envelopes marked “FINANCIAL PART” shall remain unopened and will be held in the safe custody of the Employer until the second public Bid opening.

8.        All Bids must be accompanied by a Bid-Securing Declaration using the form included in Section IV, Bidding Forms.

9.        Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document.

10.      The address(es) referred to above is (are):

  Interim Project Coordinator,

  Project Implementation Unit “PIU” Office, 6th Block, 2nd Floor,

  Somali Electricity Sector Recovery Project, 

  Ministry of Energy and Water Resources,

  Airport Road, next to Ali Jim’ale Mosque,

  Waberi District, Mogadishu, Somalia

  Email address: sesrp.procurement@gmail.com. Copy: dg@moewr.gov.so

  Contact No: +252 770 980 456,

  Website: https://sesrp.moewr.gov.so/company-overview/careers/