INDONESIA
GEOTHERMAL CLEANENERGY INVESTMENT PROJECT
PT PERTAMINA GEOTHERMAL ENERGY (PGE)
IBRD LOAN NO. 8082-IND AND CTF NO. TF10407-IND
PROJECT ID P113078
INVITATION FOR PREQUALIFICATION
This invitation for prequalification follows the General Procurement Notice for this project that was posted online on July 22, 2010 and in dgMarket and UNDB and UNDB print edition issue No. 780 dated August 16, 2010 and the revised general procurement notice posted online on December 2, 2011.
PT Pertamina Geothermal Energy (PGE) has received financing from the International Bank for Reconstruction and Development (IBRD) and Clean Technology Fund (CTF) toward the cost of the Geothermal Clean Energy Investment Project, and it intends to apply part of the proceeds toward payments under the contracts for:
- Geothermal Clean Energy Investment Project EPC Contract for Steam Gathering System and Power Plant for Ulubelu 3&4 with the expected output of 110 MW; and
- Geothermal Clean Energy Investment Project EPC Contract for Steam Gathering System and Power Plant for Lahendong (Tompaso) 5&6 with the expected output of 40 MW.
PGE intends to prequalify contractors and/or firms for EPC Contract for Steam Gathering System and Power Plant as above mentioned. It is expected that invitations to bid will be made in second week of April 2013.
Prequalification will be conducted through the procedures as specified in the World Bank's Guidelines: Procurement under IBRD Loans and IDA Credits, (May 2004, revised in October 2006 and May 2010), and is open to all eligible bidders as defined in the guidelines.
Interested eligible bidders may obtain further information, and inspect the prequalification documents, from PGE at the address below during office hours from 08.00 AM to 15.00 PM Jakarta Time or download the file in our website. A complete set of prequalification documents in English may be available free of charge.
Those firms who submitted their applications against the previous Invitation to Pre-qualification need not necessarily resubmit their previous responses but can update the relevant information based on the revised pre-qualification document. However, it is up to the applicants to sendupdates or to resubmit their applications as a whole
Applications for prequalification for each package should be submitted separately in clearly marked envelopes and delivered to the address below latest at 15.00 PM Jakarta Time on March 18, 2013. Late applications will be rejected.
Attention:
Bidding Committee
PT Pertamina Geothermal Energy
Menara Cakrawala, 8th Floor
Jl. MH Thamrin No 9,
Jakarta 10340, Indonesia.
Tel: +62 (21) 398 33222
Fax: +62 (21) 398 33230
E-mail: iriyanto@pertamina.com or mpdewi@pertamina.com
Web site: www.pge.pertamina.com